FIELDWORK 2005: ‘STREAM CHANNEL CHANGES DOWNSTREAM’

WRITE-UP DEADLINES:

14th OCTOBER                 

Introduction

Aim

Hypothesis

OS Map of Field Sites

Sketch Map of Field Sites

Relief Map of Field Sites

21st OCTOBER                 

Methodology (inc. diagrams)

Equipment / Apparatus

Site 1 Information

- explanation of results

- photos (labelled)

- results tables

- further sketch maps (plan / cross-section)

18th NOVEMBER            

Site 2 Information

- explanation of results

- photos (labelled)

- results tables

- further sketch maps (plan / cross-section)

 

 Site 3 Information

- explanation of results

- photos (labelled)

- results tables

- further sketch maps (plan / cross-section)

 

Overall Evaluation of Data / Conclusions

Draft In

 

25th NOVEMBER            

Draft versions returned for revisions

 

2nd DECEMBER                 

Limitations of Study

Contents Page

Appendices

Amendments to Field Study Report

 

9th DECEMBER                  PROVISIONAL HAND-IN


What i need to know

Google